GetAssetPack

Former Site of Jilin Library

Former Site of Jilin Library
Price
Free
Type
3D Models
Dimensions
3D

An interactive 3D model of the former Jilin Library, completed in 1958, with a 12,000-square-meter original building and a book depository added in 1982.

Explore Former Site of Jilin Library with an interactive 3D model on FUNES.WORLD. Construction of the library building on Xinmin Avenue began in 1957 and was completed in 1958. It began trial operations the same year and was officially inaugurated in 1960. The site covers an area of 24,000 square meters, and the original building had a total floor space of 12,000 square meters, which included a 3,000-square-meter book depository added in 1982.

Available on

Search by image

Upload a reference to find previews with similar colors, contrast, and detail.

Former Site of Jilin Library

Former Site of Jilin Library
FunesFree
3D Models
License not indexed
  • i Check the terms on the original listing.
Show full terms

Explore Former Site of Jilin Library with an interactive 3D model on FUNES.WORLD. Construction of the library building on Xinmin Avenue began in 1957 and was completed in 1958. It began trial operations the same year and was officially inaugurated in 1960. The site covers an area of 24,000 square meters, and the original building had a total floor space of 12,000 square meters, which included a 3,000-square-meter book depository added in 1982.

An interactive 3D model of the former Jilin Library, completed in 1958, with a 12,000-square-meter original building and a book depository added in 1982.

View original listing